Drying box
The finished box
The finished box is an upright insulated cabinet, about 2 ft deep × 4 ft wide × 4 ft tall inside. It holds nine 2×4 ft screen trays, 72 sq ft of shelf, and keeps them at 35% RH in an 85% RH barn. It doesn't remove water by refrigeration. It warms barn air about 25°F, from roughly 45°F to 70°F, and that alone drops the air's RH from 85% to about 35%.
Two heaters at the bottom warm the air. It rises through the nine trays, which slide in from a full-height front door, and picks up moisture from the chips. The exhaust fan pushes it out the top whenever RH goes above 35%, and fresh barn air comes in through the low vents.
Materials list
The 72 sq ft build runs about $500. Dropping to one heater saves about $47, but drying takes roughly twice as long. Prices are approximate November 2026 retail listings. A salvaged freezer no longer works: nine trays need a 4 ft tall cabinet with a front door, so this is a foam-board build.
| Item | Qty | Approx. price | Notes |
|---|---|---|---|
| 2 in XPS foam board, 4×8 ft, R-10 | 3 sheets | ~$135 | e.g. Owens Corning FOAMULAR 150. Covers a 2×4×4 ft interior with offcuts to spare. |
| Foil tape + foam-safe construction adhesive | 2 + 1 | ~$25 | Seals every seam. |
| Door hardware: 3 hinges, 2 latches, weatherstrip | 1 set | ~$30 | The whole 4×4 ft front is the door. |
| 1×2 lumber, 8 ft | 20 | ~$60 | Nine tray frames with a center brace each, plus nine pairs of rails. |
| Fiberglass window screen, 48 in × 25 ft roll | 1 | ~$20 | Nine 22×46 in pieces use about 18 ft. |
| Staples, screws, corner brackets | 1 lot | ~$15 | |
| 250 W ceramic heat emitter | 2 | ~$55 | Gives off heat, no light, no open element. 150 W Zoo Med ReptiCare is $29.99; the 250 W is similar. |
| Porcelain clamp lamp with wire guard, rated for ceramic emitters | 2 | ~$40 | e.g. Zoo Med Wire Cage Clamp Lamp. Never a plastic socket. |
| Inkbird ITC-308 thermostat + IHC-200 humidistat | 1 pair | $71.99 | Walmart bundle. The ITC-308 runs both heaters (1,100 W max); the IHC-200 runs the fan. |
| AC Infinity AXIAL LS1238 120 mm fan, 62 CFM | 1 | ~$25 | Listing. The exhaust. Still enough airflow at this size. |
| Small clip fan | 1 | ~$15 | Stirs the air so nine trays dry evenly. Worth it at this height. |
| Intake vents: 4 in soffit vents or holes with screen | 2 | ~$10 | Low on the back wall, one near each end. |
Construction process
The build takes a full day. The sequence is shell and door, rails, trays, airflow, heat, controls, then a test run before any chips go in.
- Build the shell. Cut 2 in XPS into an upright box about 2 ft deep × 4 ft wide × 4 ft tall inside. Glue and foil-tape every seam. Set it on a pallet or 2×4s so it sits off the barn floor.
- Hang the door. The whole 4×4 ft front is the door. Hinge it on one side with three hinges, add two latches, and weatherstrip the opening.
- Fit the tray rails. Screw 1×2 cleats front-to-back on the two 2 ft side walls, nine levels, 3.5 in apart. Start the lowest level 10 in above the floor to leave room for the heaters. The top tray lands about 42 in up, leaving 6 in for the exhaust fan.
- Build nine trays. Make 1×2 frames about 22 × 46 in, laid flat, with a center brace across the short way. Staple fiberglass screen tight across each one. They slide in from the front like drawers.
- Cut the vents.
- Exhaust: a 120 mm square hole high on one side wall, above the top tray. Mount the LS1238 fan blowing out.
- Intake: two 4 in holes low on the back wall, below the lowest tray, covered with screen or soffit vents.
- Mount the heaters. Fix the two porcelain clamp lamps to the floor, about 16 in apart, pointing sideways or up, wire guards on. Keep at least 8 in of clear air between each guard and the lowest tray. Clip the stirring fan low on the wall, aimed across the floor.
- Place the sensors.
- Thermostat probe: mid-height, away from the heaters' direct path.
- Humidistat probe: next to the middle (fifth) tray.
- Run the cords out through a small notch and seal it with tape.
- Wire the controls outside the box.
- Both heaters → ITC-308 heat outlet through a heavy-duty splitter, set to 70°F (21°C) with a 2°F swing. 500 W total is well inside its 1,100 W limit.
- Exhaust fan → IHC-200 dehumidify outlet, set to switch on above 35% RH.
- Plug both into a grounded outlet on a circuit with nothing else running. An extension cord must be rated for at least 15 A.
- Test run, empty. Close the door for 2–3 hours. Check that it holds about 70°F, that RH falls toward 35%, and that the guards and the walls near them stay only warm to the touch.
- Load and dry. Spread the chips 1 in deep on all nine trays. Restart the controls. Once a day, swap the top three trays with the bottom three.
- Call it dry. The chips are done when the box holds 35% RH and the exhaust fan rarely comes on. Expect 2–4 days from barn-damp.
Energy and running costs
Drying a full 72 sq ft load costs about $10–20 in electricity, and holding the box at 35% afterward about $15–22 a month. The costs below use PG&E's E-1 Tier 2 rate of 40.702¢/kWh, effective June 1, 2026 (GreenCalculus, rates as filed). Most of this load will land above baseline, which is why Tier 2 is used. Tier 1 (32.561¢) would make these about 20% lower.
| Phase | Average draw | Hours | Energy | Cost |
|---|---|---|---|---|
| Drying, fast (2 days) | ~520 W | 48 | ~25 kWh | ~$10 |
| Drying, slow (4 days) | ~520 W | 96 | ~50 kWh | ~$20 |
| Holding at 35%, per day | 50–75 W | 24 | 1.2–1.8 kWh | $0.50–0.75 |
| Holding at 35%, per month | 50–75 W | 720 | 36–54 kWh | $15–22 |
| Desiccant dehumidifier instead, 5-day dry | 300–600 W | 120 | 36–72 kWh | $15–29 |
How the numbers come out:
- Drying runs both 250 W heaters most of the time, plus the fans (about 20 W). A 72 sq ft load holds about 1.8 times the water of a 40 sq ft one, so it needs about twice the heat. The heaters warm the incoming barn air about 25°F and supply the heat that evaporates the water.
- One heater instead of two uses about the same total energy. It just takes roughly twice as long: 4–8 days.
- Holding only has to make up heat leaking through about 64 sq ft of R-10 wall at a 25°F difference, about 47 W, plus the fan now and then.
- Skip holding entirely by sealing the dried chips in airtight totes. That cuts the ongoing cost to zero.
Safety and storage
Dry pine and its fine dust catch fire easily. The heaters are the only real risk in this build.
- Heaters: use ceramic emitters only, never a bare bulb or an open coil, in porcelain sockets with their wire guards on.
- Clearance: keep at least 8 in between each guard and the lowest tray. Sweep chips and dust off the floor of the box after every load.
- Overheat backstop: set the ITC-308's high-temperature alarm to about 90°F, so a stuck relay gets noticed.
- Power: run a grounded outlet or a 15 A-rated cord, with nothing else on that circuit in the barn.
- Storage once dry: seal the chips in airtight totes or heavy bags with a silica gel canister. They hold about 7% moisture with no power. Unplug the box if you aren't holding chips in it.